PROJECT The new Ajaccio Hospital, located on the east side of the city with a scenic view of the sea, has replaced the old one and has become the main medical centre for the whole island. With its 340 beds, the hospital offers all types of facilities for patient care, including the emergency room, radiology, general medicine, surgery with eight operating theaters, gynecology and obstetrics, intensive care, and cardio-vascular divisions.
CHALLENGE The Hospital was built in strict compliance with environmental and energy saving standards, according to the French certification HQE (Haute Qualité Environnementale).
SOLUTION In the new Ajaccio Hospital, 4 Climaveneta high efficiency water cooled chillers i-FX-W (1+i) 3402 for a total cooling capacity of about 4,000 kW were installed. For the air distribution in the hospital 640 fan coil units, belonging to a-LIFE and a-HWD2 ranges, were chosen, while the air treatment is provided by 60 Wizard air handling units. Moreover 23 AHUs have been installed as extractors. The supply contract also included 16 Accurate close control units, which are installed in the data center of the hospital. The whole HVAC system is managed by ClimaPRO, Climaveneta’s management and optimization system.