Trecate Logistics Hub

Trecate Logistics Hub
Trecate, Novara - Italy

COMFORT APPLICATIONS
Share |
Period: 2019 - 2021
Application: Logistics
Plant type: Hydronic System - Air to Air System
Cooling capacity: 10550
Installed machines: 69 X WET2 RTF-PV PV 05247HR-P; 3 X Wizard 1720; 3 X HRD2; 1 X 1 ERACS2-Q-G05/LN-CA 1062
Certifications: LEED - Platinum
Description
PROJECT
Strategically located 40 km west of Milan, 7 km from Novara, and close to Malpensa airport, the new logistics center has a total area of 420,000 square meters, 200,000 of which are indoors.
The development consists of two buildings: Building A, which has been operating since early March, which is spread over 60,000 square meters, of which 1,500 square meters of offices, and includes 51 loading docks and Building B, which will be operational in about a year, of 100,000 square meters of which 7,500 square meters of offices, with annexes 85 loading docks.

CHALLENGE
The project has been designed according to advanced technological and environmental standards to achieve the highest levels of LEED certification. The technological systems in service of the two buildings were also designed following energy efficiency drivers and sustainability goals.

SOLUTION
The air conditioning system of Building A, designed and installed by Techbau and supplied by Mitsubishi Electric, is based on 69 WET2 RTF-PV PV 05247HR-P rooftop units, 3 Wizard 1720 AHUs, 3 heat recovery HRD2 and 1 ERACS2-Q-G05/LN-CA 1062 multipurpose heat pump, all Climaveneta branded, as well direct expansion multi split and cassette units for dedicated areas.